Earthworks Takeoffs
Cut/fill quantities measured from drawings and tied to the ground model.
Bulk cut
16.7k
m³ (incl. bulking)
Imported fill
1.9k
m³ capping
Muck-away
926
20t loads (est.)
Scopes
3
auto-detected
Measured scopes
| Scope | X-section | Length | Bulking | Volume (m³) |
|---|---|---|---|---|
| Strip Made Ground | 1.80 m² | 4200 m | ×1.2 | 9,072 |
| Excavate soft Alluvium | 1.60 m² | 3800 m | ×1.25 | 7,600 |
| Granular capping fill | 0.45 m² | 4200 m | ×1 | 1,890 |
Quick cut/fill
Cut7,560 m³
Fill1,890 m³
Net (cut − fill)5,670 m³